The worst is yet to come for motorists who have to deal with the La Fontaine tunnel megasite, even if Monday was less chaotic than expected.
• Read also: Here’s why congestion could get heavier tomorrow
• Read also: The real ordeal will be felt in the coming days
• Read also: 5 options to avoid tunnel chaos
• Read also: He rents a room at his own expense to avoid traffic
Monday was “a preparatory test” and traffic will start again on Tuesday, according to traffic columnist Daniel Evans. The host at Radio Circulation 730 even said he was surprised at the fluidity of the traffic.
“It’s Halloween, so there are several who aren’t working. And telecommuting has become very popular, especially when you live on the North Shore or on the South Shore,” he says.
Since Monday, construction work has blocked access to half of the Louis-Hippolyte-La Fontaine tunnel, leaving users with one lane towards the South Shore and two lanes towards the North Shore, until 2025 at least.
“The rush hour for returning home for the next three years is going to be, I think, more problematic than that of the morning”, analyzes Patrick Benoit, columnist circulation at Hi hello.
Photo Martin Chevalier
Monday morning traffic in the tunnel.
Expectation to come
About 120,000 vehicles use the tunnel every day, 13% of which are trucks.
“Two years ago, it took 10 minutes to go from the Anjou interchange to the tunnel, says Louis-André Bertrand, spokesperson for the Quebec Ministry of Transport (MTQ). Tuesday, we are around 35 minutes. That’s about three and a half times longer.”
“We are not at the end of our troubles. We spend our days on the road, it will be extremely painful, ”says Lahouari Boukhatem, a taxi driver, met near the Galeries d’Anjou on Monday.
- The best way to start the day with your coffee is the show every day from 6 a.m., live or via podcast at :
Quiet day
On Monday, the anticipated monster congestion did not materialize, as nine representatives of the Log who tested the road network during rush hour.
When The newspaper took the tunnel from the South Shore, around 7:45 a.m., you could even drive at the speed limit.
According to real-time data from the MTQ, the hot moment of returning home was around 3 p.m., when it took about 50 minutes to complete the last five kilometers leading to the tunnel.
The slowdown was felt beyond the Anjou interchange, both on the A25 and the A40.
Traffic flowed smoothly on the other bridges leading to the South Shore.
“The fact that there are configuration changes, of course that makes a clear difference. Do we notice more traffic on the other bridges? The answer is no,” assesses Mr. Evans.
A sign that people have mostly avoided going to the metropolis, no significant increase has been observed in public transport.
– With Erika Aubin, Jonathan Tremblay and Marianne Langlois
10 minutes: 2 years ago
35 minutes: En day monday
50 minutes: at 3 p.m., at the worst of the day Monday
Source: Ministry of Transport